Dr. Howard Elementary School has one of the more dramatic building projects happening as a result of the facitilites referendum, and one that is much needed. It’s going to be completely demolished and rebuilt on the same site.
From 5:30 to 7:30 p.m. on April 10th, you can visit the Dr. Howard cafeteria, where there will be stations set up to preview floor plans, timelines, and the like. Here is the flyer: